GMV is embarking on a strategic project for the operational rollout of the ESA’s new EGS-CC (European Ground System Common Core) infrastructure. GMV will launch a monitoring and control system adopting this infrastructure on the SWARM and Sentinel-6 missions currently in orbit, demonstrating the multimission and multisatellite capabilities of the system. It is a key project in the operational rollout of the EGS-CC as it is its first use in a live in-flight mission.